Top of Page
Skip to Content
CPS Home
Navigation
Shortcut Links
Table of Contents
Translation widget
Toggle Search
Search
Close
Main Navigation
Vol 1: Overview
Volume 1: General Overview And Goals
1.0 Introduction
1.1 Program Overview and Goals
1.2 CPS Design & Construction Standards
1.3 Regulatory Codes, Ordinances and Standards
1.4 How to Use these Guidelines
2.0 District Introduction/Overview
2.1 District Overview
2.2 CPS Facility Types
2.3 Creation of New Schools
2.4 Lease Spaces
2.5 Co-locations
2.6 Access and Enrollment
Close Vol 1: Overview Subnav
Vol 2: Planning
Volume 2: Planning
1.0 Research
1.1 Pre-Planning
1.2 Renovation Pre-Planning
2.0 Planning By Facility Type
2.1 Planning Vision
2.2 Planning by Facility Type
2.3 Additions, Annexes and Modulars
3.0 Energy Efficiency and Sustainability Planning
3.1 Overview
3.2 Location and Transportation
3.3 Water Efficiency
3.4 Energy and Atmosphere
3.5 Materials and Resources
3.6 Interior Environmental Quality
3.7 Innovation in Design
4.0 Environmental
4.1 Philosophy and Goals
4.2 Environmental for New Construction
4.3 Environmental for Renovation
4.4 Environmental for Demolition
Close Vol 2: Planning Subnav
Vol 3: New Construction
Volume 3: New Construction Guidelines
1.0 Site and Landscape
1.1 Site Overview
1.2 Site Project Planning
1.3 Site Access, Circulation and Parking
1.4 Site Programming
1.5 Site Engineering
1.6 Site Materials
1.7 Site Amenities
1.8 Landscaping
1.9 Site Safety and Security
1.10 Site Accessibility
1.11 Operations and Maintenance
2.0 General Standards
2.1 Construction
2.2 Circulation
2.3 Interior Design
2.4 Building Support
2.5 Toilet Rooms
2.6 Accessibility Practices
2.7 Acoustics
2.8 Furniture
3.0 Elementary Schools
3.1 Core Classroom Teaching Stations
3.2 Classroom Teaching Stations
3.3 Administration Spaces
3.4 Student Services Suite
3.5 Dining Center
3.6 Library/Media Center
3.7 Physical Education and Sports Administration
4.0 High Schools
4.1 Core Classroom Teaching Stations
4.2 Classroom Teaching Stations
4.3 Administrative Spaces
4.4 Student Services Suite
4.5 Dining
4.6 Library/Media Center
4.7 Physical Education and Sports Administration
4.8 Fine and Performing Arts and Technology
4.9 CTE Classrooms - Career and Technical Education
5.0 Structural
5.1 Design Standards and Performance Requirements
5.2 Design Live Loads
5.3 Natural Hazard Mitigation
5.4 Prescriptive Structural Requirements
6.0 Heating, Ventilating and Air Conditioning
6.1 Overview and Design Concept
6.2 Design Criteria
6.3 System Selection and Design
7.0 Plumbing
7.1 Overview and Design Concept
7.2 Design Criteria
7.3 System Selection and Design
8.0 Fire Protection Systems
8.1 Overview and Design Concept
8.2 Design Criteria
8.3 System Selection and Design
9.0 Electrical System
9.1 Overview and Design Concept
9.2 Selection and Design
Close Vol 3: New Construction Subnav
Vol 4: Renovations
Volume 4: Renovations
1.0 General Standards
1.1 Renovation Overview
1.2 Renovation Preliminary Scope Definition
1.3 Coordination with School
2.0 Project Types and Typical Scope Elements
2.1 Site
2.2 Exterior
2.3 Interior
3.0 Structural
3.1 Dever Projects
4.0 Mechanical Projects
4.1 Outdoor AHUs and RTUs
4.2 Chillers/Towers and Enclosures
4.3 Exhaust Fans
4.4 Ducts and Pipe Routing
4.5 Boiler Projects
4.6 Dampers and Actuators
4.7 Hydronic Heating Elements
4.8 Pumps
4.9 Chimney Stacks
4.10 Generators
4.11 Air Tunnels
4.12 Thermostats
4.13 Unit Ventilator Replacement
4.14 BAS or Pneumatic Systems
4.15 AHU Refurbishment
4.16 HVAC Testing
4.17 Science Rooms
5.0 Electrical Projects
5.1 Power Distribution
5.2 Emergency Systems
5.3 Classroom Intercom System
5.4 Lighting Replacement
5.5 IT and Security Systems
5.6 Fire Alarm Replacement
6.0 Plumbing Projects
6.1 Water Heaters
6.2 Hot Water Distribution
6.3 Sanitary Drains
6.4 Sump Pumps and Perimeter Drainage
6.5 Stormwater Repairs
6.6 Roof Replacement Projects
6.7 Distribution Piping Replacement
6.8 Fixture Replacement and Toilet Room Modifications
7.0 Fire Protection
7.1 Fire Protection Renovation
Close Vol 4: Renovations Subnav
Vol 5: Appendices
Volume 5: Appendices
Appendix A
A1.1 Drawings
A1.2 Planning Modules and Checklists
A1.3 Drawing Sets
Appendix B
B1.1
Appendix C
C1.1.1 Map of CPS Schools by Regions
Appendix D
Appendix E
Close Vol 5: Appendices Subnav
Navigation
CPS Home
Open Navigation
Close Navigation
Search
Search
Main Navigation
Vol 1: Overview
View Vol 1: Overview Subnav
Close Vol 1: Overview Subnav
Vol 1: Overview
Close Navigation
1.0 Introduction
View Vol 1: Overview Subnav
Close 1.0 Introduction Subnav
1.0 Introduction
Close Navigation
1.1 Program Overview and Goals
1.2 CPS Design & Construction Standards
1.3 Regulatory Codes, Ordinances and Standards
1.4 How to Use these Guidelines
2.0 District Introduction/Overview
View Vol 1: Overview Subnav
Close 2.0 District Introduction/Overview Subnav
2.0 District Introduction/Overview
Close Navigation
2.1 District Overview
2.2 CPS Facility Types
2.3 Creation of New Schools
2.4 Lease Spaces
2.5 Co-locations
2.6 Access and Enrollment
Vol 2: Planning
View Vol 2: Planning Subnav
Close Vol 2: Planning Subnav
Vol 2: Planning
Close Navigation
1.0 Research
View Vol 2: Planning Subnav
Close 1.0 Research Subnav
1.0 Research
Close Navigation
1.1 Pre-Planning
1.2 Renovation Pre-Planning
2.0 Planning By Facility Type
View Vol 2: Planning Subnav
Close 2.0 Planning By Facility Type Subnav
2.0 Planning By Facility Type
Close Navigation
2.1 Planning Vision
2.2 Planning by Facility Type
2.3 Additions, Annexes and Modulars
3.0 Energy Efficiency and Sustainability Planning
View Vol 2: Planning Subnav
Close 3.0 Energy Efficiency and Sustainability Planning Subnav
3.0 Energy Efficiency and Sustainability Planning
Close Navigation
3.1 Overview
3.2 Location and Transportation
3.3 Water Efficiency
3.4 Energy and Atmosphere
3.5 Materials and Resources
3.6 Interior Environmental Quality
3.7 Innovation in Design
4.0 Environmental
View Vol 2: Planning Subnav
Close 4.0 Environmental Subnav
4.0 Environmental
Close Navigation
4.1 Philosophy and Goals
4.2 Environmental for New Construction
4.3 Environmental for Renovation
4.4 Environmental for Demolition
Vol 3: New Construction
View Vol 3: New Construction Subnav
Close Vol 3: New Construction Subnav
Vol 3: New Construction
Close Navigation
1.0 Site and Landscape
View Vol 3: New Construction Subnav
Close 1.0 Site and Landscape Subnav
1.0 Site and Landscape
Close Navigation
1.1 Site Overview
1.2 Site Project Planning
1.3 Site Access, Circulation and Parking
1.4 Site Programming
1.5 Site Engineering
1.6 Site Materials
1.7 Site Amenities
1.8 Landscaping
1.9 Site Safety and Security
1.10 Site Accessibility
1.11 Operations and Maintenance
2.0 General Standards
View Vol 3: New Construction Subnav
Close 2.0 General Standards Subnav
2.0 General Standards
Close Navigation
2.1 Construction
2.2 Circulation
2.3 Interior Design
2.4 Building Support
2.5 Toilet Rooms
2.6 Accessibility Practices
2.7 Acoustics
2.8 Furniture
3.0 Elementary Schools
View Vol 3: New Construction Subnav
Close 3.0 Elementary Schools Subnav
3.0 Elementary Schools
Close Navigation
3.1 Core Classroom Teaching Stations
3.2 Classroom Teaching Stations
3.3 Administration Spaces
3.4 Student Services Suite
3.5 Dining Center
3.6 Library/Media Center
3.7 Physical Education and Sports Administration
4.0 High Schools
View Vol 3: New Construction Subnav
Close 4.0 High Schools Subnav
4.0 High Schools
Close Navigation
4.1 Core Classroom Teaching Stations
4.2 Classroom Teaching Stations
4.3 Administrative Spaces
4.4 Student Services Suite
4.5 Dining
4.6 Library/Media Center
4.7 Physical Education and Sports Administration
4.8 Fine and Performing Arts and Technology
4.9 CTE Classrooms - Career and Technical Education
5.0 Structural
View Vol 3: New Construction Subnav
Close 5.0 Structural Subnav
5.0 Structural
Close Navigation
5.1 Design Standards and Performance Requirements
5.2 Design Live Loads
5.3 Natural Hazard Mitigation
5.4 Prescriptive Structural Requirements
6.0 Heating, Ventilating and Air Conditioning
View Vol 3: New Construction Subnav
Close 6.0 Heating, Ventilating and Air Conditioning Subnav
6.0 Heating, Ventilating and Air Conditioning
Close Navigation
6.1 Overview and Design Concept
6.2 Design Criteria
6.3 System Selection and Design
7.0 Plumbing
View Vol 3: New Construction Subnav
Close 7.0 Plumbing Subnav
7.0 Plumbing
Close Navigation
7.1 Overview and Design Concept
7.2 Design Criteria
7.3 System Selection and Design
8.0 Fire Protection Systems
View Vol 3: New Construction Subnav
Close 8.0 Fire Protection Systems Subnav
8.0 Fire Protection Systems
Close Navigation
8.1 Overview and Design Concept
8.2 Design Criteria
8.3 System Selection and Design
9.0 Electrical System
View Vol 3: New Construction Subnav
Close 9.0 Electrical System Subnav
9.0 Electrical System
Close Navigation
9.1 Overview and Design Concept
9.2 Selection and Design
Vol 4: Renovations
View Vol 4: Renovations Subnav
Close Vol 4: Renovations Subnav
Vol 4: Renovations
Close Navigation
1.0 General Standards
View Vol 4: Renovations Subnav
Close 1.0 General Standards Subnav
1.0 General Standards
Close Navigation
1.1 Renovation Overview
1.2 Renovation Preliminary Scope Definition
1.3 Coordination with School
2.0 Project Types and Typical Scope Elements
View Vol 4: Renovations Subnav
Close 2.0 Project Types and Typical Scope Elements Subnav
2.0 Project Types and Typical Scope Elements
Close Navigation
2.1 Site
2.2 Exterior
2.3 Interior
3.0 Structural
View Vol 4: Renovations Subnav
Close 3.0 Structural Subnav
3.0 Structural
Close Navigation
3.1 Dever Projects
4.0 Mechanical Projects
View Vol 4: Renovations Subnav
Close 4.0 Mechanical Projects Subnav
4.0 Mechanical Projects
Close Navigation
4.1 Outdoor AHUs and RTUs
4.2 Chillers/Towers and Enclosures
4.3 Exhaust Fans
4.4 Ducts and Pipe Routing
4.5 Boiler Projects
4.6 Dampers and Actuators
4.7 Hydronic Heating Elements
4.8 Pumps
4.9 Chimney Stacks
4.10 Generators
4.11 Air Tunnels
4.12 Thermostats
4.13 Unit Ventilator Replacement
4.14 BAS or Pneumatic Systems
4.15 AHU Refurbishment
4.16 HVAC Testing
4.17 Science Rooms
5.0 Electrical Projects
View Vol 4: Renovations Subnav
Close 5.0 Electrical Projects Subnav
5.0 Electrical Projects
Close Navigation
5.1 Power Distribution
5.2 Emergency Systems
5.3 Classroom Intercom System
5.4 Lighting Replacement
5.5 IT and Security Systems
5.6 Fire Alarm Replacement
6.0 Plumbing Projects
View Vol 4: Renovations Subnav
Close 6.0 Plumbing Projects Subnav
6.0 Plumbing Projects
Close Navigation
6.1 Water Heaters
6.2 Hot Water Distribution
6.3 Sanitary Drains
6.4 Sump Pumps and Perimeter Drainage
6.5 Stormwater Repairs
6.6 Roof Replacement Projects
6.7 Distribution Piping Replacement
6.8 Fixture Replacement and Toilet Room Modifications
7.0 Fire Protection
View Vol 4: Renovations Subnav
Close 7.0 Fire Protection Subnav
7.0 Fire Protection
Close Navigation
7.1 Fire Protection Renovation
Vol 5: Appendices
View Vol 5: Appendices Subnav
Close Vol 5: Appendices Subnav
Vol 5: Appendices
Close Navigation
Appendix A
View Vol 5: Appendices Subnav
Close Appendix A Subnav
Appendix A
Close Navigation
A1.1 Drawings
A1.2 Planning Modules and Checklists
A1.3 Drawing Sets
Appendix B
View Vol 5: Appendices Subnav
Close Appendix B Subnav
Appendix B
Close Navigation
B1.1
Appendix C
View Vol 5: Appendices Subnav
Close Appendix C Subnav
Appendix C
Close Navigation
C1.1.1 Map of CPS Schools by Regions
Appendix D
Appendix E
Focus On
Table of Contents
Translation widget
Main
Design and Construction
/
Vol. 3 New Construction Guidelines
/
1.0 Site and Landscape
1.4 Site Programming
Menu
1.0 Site and Landscape
Close menu
1.4 Site Programming
1.4.1 Entry Plazas
1.4.2 High School Outdoor Athletic Facilities
1.4.3 Elementary School Play Fields
1.4.4 Playgrounds
1.4.5 Natural Amenities
1.4.6 Other Programmatic Elements
1.4.7 Space to Grow Program
1.4 Site Programming
1.4.1 Entry Plazas
1.4.2 High School Outdoor Athletic Facilities
1.4.3 Elementary School Play Fields
1.4.4 Playgrounds
1.4.5 Natural Amenities
1.4.6 Other Programmatic Elements
1.4.7 Space to Grow Program