Replace all existing galvanized piping in the existing distribution system. At locations of connections from new piping to existing galvanized piping, use proper dielectric connections. All new piping must be sized per current code requirements and meet CPS standards. Replacement of piping “like for like” without evaluation of the building’s demand is not acceptable.
Coordination must be made with Architect and Environmental Engineers for removal and replacement of walls, ceilings and other building elements for any piping replacement.